Although eight steel girders, each about 30 metre long, were brought to the project site, sanction was awaited from the Principal Chief Engineer of the railways for erecting them
Back to Top News
Top
September 26, 2026 at 1:54 PM
Clearance given for erecting girders atop piers of overbridge near Fort Station: MP
The Hindu
Excerpt from The Hindu.