The works include laying a concrete pavement along the bus movement corridor within the terminus at ₹1.99 crore and construction of a concrete road at the bus exit connecting to the Sungam bypass at ₹1.66 crore
Back to Top News
Top
August 7, 2026 at 1:22 PM
Coimbatore Corporation earmarks additional ₹3.6 crore for Ukkadam bus terminus works
The Hindu